Utherm Sarking LE Plus: PIR and membrane in a roof assembly

At a glance

The factory-bonded combination of the membrane with Utherm Sarking LE Plus simplifies part of the build-up above the rafters. However, it does not complete the connections at windows, at the eaves and at service penetrations. A consistent system requires defining both these locations and the airtightness on the attic side. Utherm Sarking LE Plus is one of the PIR boards for pitched roofs. On both sides it has a multi-layer gas-tight laminate. The terms “polyurethane boards” and “polyurethane foam” are broader than the precise designation of the PIR product. The PIR boards should be shown in a section that explains the difference between Utherm Sarking LE and the LE Plus variant with the additional membrane. When selecting the layers, the full name of the Sarking variant must be established before choosing additional membranes.

Two boards with dark and silver surfaces, accompanying the Utherm Sarking LE Plus guide

Sarking LE PIR boards and an additional Plus membrane

The individual components do not work independently, because the standard LE variant cannot be assigned a factory-made component characteristic of Plus. The adopted layer build-up should allow the actual scope of the underlay layer to be established even before purchase. In the system description, show the name of the variant and a list of the separate materials for laps and terminations together with the location of the remaining components.

Resistance of the layer above the timber structure

In the UNILIN catalogue, Sarking LE Plus has a lambda of 0.022 W/(m·K). Laying this insulation above the rafters adds thermal resistance also along the path passing through the timber. When comparing build-ups, therefore, include the continuity of the above-rafter layer instead of attributing the effect solely to the infill between the rafters.

A section through Sarking LE Plus should show the timber rafters, fasteners passing through the insulation and the termination at the wall. The layer above the timber reduces its influence on heat flow, but does not remove every thermal bridge. When comparing two solutions, distinguish the benefit of a small thickness from the improvement in insulation continuity. Select the thickness and accessories from an assessment of the structure and roof-to-wall junction, rather than the core name alone.

Polyurethane insulation made from large profiled boards

Sarking LE Plus has a format of 2400 × 1200 mm and a tongue and groove on all four sides. After measuring out the roof slope, check where the factory profile will be preserved and where a cut piece will be created. The drawing must separately indicate the fixing to the structure and the closing of the underlay layer: pushing the locks together does not perform either of these tasks.

Before determining the geometry of the detail, it is worth fitting the large Sarking LE Plus boards to the roof valley, eaves and openings. A regular field does not describe all the details, because cutting to size may remove the profile and require a different termination solution. The detail should allow the arrangement of elements to be planned before the material is brought onto the sloping surface. When checking the completeness of the system, take into account the position of the factory edges, supports and cut lines in difficult locations, and not only the parameters of the core.

Membrane laps and terminations at openings

The membrane factory-bonded to the board reduces the number of layers laid on site, but it does not close the perimeter of every penetration. Openings left by fasteners, the junction with the wall and service penetrations require sealing. When selecting the accompanying materials, determine the overlap of the Plus membrane at the roof window and at the base of the element passing through the roof slope.

When selecting the protective layers, the direction of water run-off and access to the sealing of the Plus membrane must be maintained. The connection needs its own detailing, because the membrane on the full board does not automatically close the perimeter of every opening. The sequence of execution should allow the factory part to be joined with the details made on site. In the system documentation, indicate the course of the overlaps, the accessories at penetrations and the sequence for closing the layers, and check the compatibility of every contacting material.

Requirements at the chimney and attic comfort

Reaction-to-fire class E for this PIR variant means that the material is not non-combustible, so the board does not exempt you from maintaining the required distances and safeguards in the vicinity of the chimney. When assessing the entire system with Sarking LE Plus, the zone around the chimney and the solar gains that shape the conditions in the insulated loft must therefore be analysed separately.

Before approving the system, fire protection and summer conditions in the attic must be considered separately. A single result must not be arbitrarily extended, because reaction class E does not mean non-combustibility, and a low lambda does not guarantee a single temperature in summer. Consistent data will allow the correct solution to be retained at the hot component and the actual heat sources to be assessed. When selecting the layers, match the chimney detail and the assumptions regarding windows, shading and air exchange with what will actually be implemented.

Insulation with polyurethane above the rafters: the full scope

In the offer, Sarking LE must be clearly separated from Sarking LE Plus, stating the thickness, coverage area, supplementary components and how the membrane is protected during transport. When pricing the entire system, the change in covering height resulting from adding Sarking LE Plus above the rafters must be taken into account.

Within the complete scope of materials, it is worth pricing the fixings, flashings and work at the gutter alongside Sarking LE Plus itself. The scope should be established before installation, because preserving space in the interior may involve adjusting elements on the outside of the roof. Defining the scope is intended to allow complete renovation scopes to be compared with an identical attic function. In the comparison of offers, show the layer balance and the list of works at the eaves, windows, ridge and penetrations, so that each relates to the same stage of readiness.

A case worth considering

In the system with Sarking LE Plus, the membrane is an additional factory element, but the screws and holes are created during installation. Every penetration must be related to the roof documentation. Tightness from the interior side performs a separate function. It is worth marking the course of both layers on the eaves section. This ensures that the finished board surface is not mistakenly regarded as the complete set of all required seals.

7 branches. Materials closer to your project.

Sandwich-panel.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project