Choose a material

Roofing sheets

Sandwich panels

PIR insulation boards

XPS

Accessories

Fencing

PIR insulation

IKO enertherm KR ALU as a component of a complete floor

At a glance

In a floor with KR ALU, each layer has a different task. The PIR limits heat flow, the installation supplies energy, and the screed and finish work under load. The printed grid does not combine these functions into one ready-made design. Levels and requirements must be agreed before wet works begin. The cross-section under consideration covers a floor build-up with insulation beneath heating and screed. The role of IKO enertherm KR ALU must be described together with the layers adjoining its surface. An important junction is the threshold between rooms and the passage of installations. Before selecting materials, the height from the substrate to the finished floor surface must be established so that the sequence of layers has a real reference.

Upright brown face with parallel printed lines, accompanying the IKO enertherm KR ALU guide

Function of the board in the cross-section

A correct build-up should limit downward heat flow and preserve the full floor cross-section. The functions of the other layers must be defined separately.

The correct product and the scope of its data

In a floor with heating and screed, IKO enertherm KR ALU acts as a layer that limits downward heat flow, not the entire heating system. The board has a PIR core and an aluminium facing with a printed alignment grid; the properties relate to the complete product, not the foam alone. Lambda 0.022 W/(m·K), compression of at least 150 kPa at 10% deformation, RD 3.60 m²K/W for 80 mm and 4.50 m²K/W for 100 mm, and reaction-to-fire class F are the data sheet figures. Selecting the installation remains a separate task, and the boards are assessed within a specific layer build-up.

Scope of the example comparison

For a floor with IKO enertherm KR ALU, first check the support, the continuity of the joints and the sealing required by the chosen build-up, and above the board a load-distributing layer. An auxiliary calculation for 100 mm and a lambda of 0.022 gives d/λ of approximately 4.55 m²K/W, separate from the declared RD. The same resistance would correspond to approximately 181.8 mm at a hypothetical lambda of 0.040, without declaring the properties of another product. However, a change of thickness requires a fresh assessment of the entire floor, including the compatibility of the facings and the fixing; resistances alone do not prove equivalence.

The calculation involving IKO enertherm KR ALU describes the stated quantity, not automatically the class of the entire system. The key assumption is the aluminium surface with the auxiliary grid. The result must be compared with the constraint defined as the balance of the height of insulation, installation, screed and finish. With regard to this cross-section, the thermal requirements must be compared with the support and the load on the floor. A floor cross-section at the threshold with the layer thicknesses shown separately is helpful, as it shows the position of each layer. Only then can the floor finish with the planned installation and screed be considered without automatically transferring the rules from another combination of materials.

How to assess the proposed change

The variant based on the decision to change the insulation thickness after checking the required resistance must be considered through the full section. In the second step, the action to be considered is: changing the finish levels without arbitrarily reducing the screed thickness. With IKO enertherm KR ALU, both proposals must preserve the requirements at the location described as the threshold between rooms and the installation penetration. Treating the printed grid as a ready-made pipe layout design must be excluded, because such a simplification changes the basis of comparison. The final scope should be confirmed by the floor and heating installation designer. For the selected solution, a schedule of the insulation, separating layers and floor construction is needed, consistent with the materials located directly below and above the insulation.

Surface and joint finish

The surface of IKO enertherm KR ALU is an aluminium laminate with a print that facilitates planning the works. Its type must be taken into account when selecting the layer with which it will work. In the documentation, the board joint and the sealing required by the floor system must also be identified, instead of replacing the actual geometry with a general symbol. Acceptance should be based on the record of the KR ALU variant and on the installation’s conformity with its design. For this reason, the floor finish with the planned installation and screed should be carried out only after the agreed inspection. On the drawing, it is worth highlighting the threshold between rooms and the installation penetration, because that is where the course of the connection changes.

The sequence of works follows from the layout

Before IKO enertherm KR ALU is laid, support with a suitable load-distributing layer must be ensured. The schedule should include inspection of the element described as the threshold between rooms and the installation penetration. For acceptance, a floor section at the threshold with the layer thicknesses shown separately, indicating any execution changes, must be prepared. After this inspection, work can proceed to the scope that is the floor finish with the planned installation and screed. The sequence should be coordinated by the floor and heating installation designer, especially when different layers are executed by different teams. This makes it possible to separate the tasks of the polyurethane insulation from the works providing the other functions of the section.

Specification ready for pricing

An enquiry for IKO enertherm KR ALU should clearly indicate the floor construction with insulation under the heating and screed. The description should be accompanied by a schedule of the insulation, separating layers and floor construction so that the supplier knows the adopted variant. A separate item may be the work needed to limit downward heat flow and preserve the full floor section. It is worth requesting a specification of the changes caused by any replacement of the covering or geometry. Every such proposal should again take into account the height balance of insulation, installation, screed and finish. After the solution is selected, the record of the KR ALU variant and of the installation’s conformity with its design must be retained as the basis for identifying the material on site. In such an order, the polyurethane boards are part of a specific system, not a category of freely interchangeable sheets.

7 branches. Materials closer to your project.

Sandwich-panel.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project