At a glance
A flat roof with swissporPIR Alu requires the substrate, vapour control layer, PIR boards, fixing and waterproofing to be selected together. The gas-tight laminate protects the core but does not replace a tight covering. According to the instructions for this product, adhesive bonding does not dispense with mechanical fixing. The requirements regarding the dryness of the boards and the design of the drains must also be observed. The guide discusses support on trapezoidal sheet metal, the arrangement of joints, height restrictions at parapets and the details of outlets and equipment. The assessment covers the full cross-section and its terminations, because the generic name polyurethane insulation does not confirm the suitability of a specific combination of roofing materials.

PIR boards on the correct roof substrate
The type of substrate beneath swissporPIR Alu determines how the layers are prepared and supported. Describe the actual fixing location together with the vapour control layer, roof drainage and covering. However, the same board does not mean the same detail on different constructions.
Layer thickness and designed falls
At a parapet or threshold, the overall roof build-up limits the space available for insulation. A lambda value of 0.022 W/(m·K) helps achieve the required thermal resistance within that space. Compare two swissporPIR Alu assemblies in sections through the outlet and low parapet, checking both the insulation thickness and its position relative to adjoining elements.
At the inlet, do not cut swissporPIR Alu down in thickness — the manufacturer prohibits this. The levels of the outlet and of a limited parapet must be reconciled in the falls design. Check the minimum and maximum height of the complete cross-section instead of reducing the insulation during installation.
Polyurethane insulation on profiled metal sheeting
Above the trapezoidal metal sheet, show the staggered run of the swissporPIR Alu joints. The instructions provide for laying one or two layers; for a single layer, milled edges or tongue-and-groove edges are recommended. The board layout should correspond to the chosen solution.
Above trapezoidal metal sheeting, the support of swissporPIR Alu depends on the upper flanges of the profile and the insulation thickness. Draw the contacts of one or two layers and the intended edges. A photograph of a completed roof does not confirm correct support on a different sheet geometry.
Mechanical fixing also when bonding
The swissporPIR Alu instructions require mechanical fastening even when adhesive is used. The method of fixing this board must therefore be described for the specific roof, rather than transferring the rules from another system.
For bonded swissporPIR Alu, retain the fasteners specified in the instructions. The design should specify their number and distribution in the roof zones, the fastening parameters and the compatibility of the waterproofing. The materials in contact at the individual joints must also be checked.
Condition of the boards before the waterproofing is applied
Before closing swissporPIR Alu under a tight covering, check that it is dry and free from damage. The instructions do not permit damp insulation to be built into the roof, even when the material itself has low water absorption.
Acceptance of the boards before covering should confirm the required condition of the material; low water absorption does not replace this check. Only once the conditions are met can the layers be closed. The fire assessment of the complete roof covering is carried out separately for the configuration that is to be executed.
Polyurethane insulation: outlets, edges and scope of works
In the cost estimate for swissporPIR Alu, itemise the preparation of the substrate, the boards, adhesives, fasteners and waterproofing. Describe separately the outlets, equipment bases and terminations, as well as the responsibility for their execution.
On a large roof area, a similar detail is repeated at many drains and items of equipment. The bill of quantities for swissporPIR Alu should link their number to the actual geometry, the auxiliary materials and the sequence of inspections. Establish acceptance of the joints before they are covered, so that the offers being compared cover the same scope.
A case worth considering
A roof with swissporPIR Alu boards requires a layer build-up: vapour control layer, thermal insulation, fixing and waterproofing, installed on a common substrate. Bonding does not replace the mechanical fixing specified in the instructions. Penetrations through the layers and their terminations must be resolved separately — a watertight field of membrane does not deal with the parapet detail. Only a complete roof covering with connected layers closes the system.