Refurbishing an industrial roof with XPS: check the loads first
XPS is lightweight, but a roof incorporating it can be considerably heavier than the existing covering. In an inverted system, protective and ballast layers are added, and sometimes a usable surface. Extruded polystyrene therefore gives no grounds for omitting an assessment of load-bearing capacity. When renovating a hall, the structure and the condition of the existing roof are checked first. Only then can it be considered whether XPS and the inverted layer sequence suit the given building. The type of structure, the spacing of supports and the composition of the existing layers must be established. Archived documentation helps, but does not always correspond to later alterations. Equipment, additional coatings or local repairs may have appeared on the roof.
