PIR insulation
Quality checks for swissporPIR Alu: from the substrate to covering the boards
At a glance
The swissporPIR Alu layer can only fulfil its function if the boards arrive at installation in an appropriate condition. The rigid core and thin facings require protection during transport, storage and cutting. Moisture, dust or a damaged edge change the conditions for making the next joint, even if the marking on the packaging is correct. The guide leads from acceptance of the delivery through preparation of the substrate to the inspection before covering. It also discusses the organisation of the reserve on the roof and the sequence of deliveries. Assessment of the actual thickness, continuity of the core and the contact surface with the next layer supplements the declared parameters of this PIR insulation.

PIR boards from receipt to the point of use
When accepting delivery of swissporPIR Alu, record the batch and photograph the edges requiring assessment. A broken corner may become invisible once further layers are installed. Assess the material before distributing it to the installation points, taking into account where the given board is to be used.
Document parameters and the actual condition of the material
The lambda value of swissporPIR Alu of 0.022 W/(m·K) applies to a product with a defined construction and thickness. Local crushing requires assessment of the actual condition. The declared parameter is not permission for arbitrary storage or damage to the material.
Tape on the facing of swissporPIR Alu does not restore broken foam or missing support. Assess the actual thickness, the continuity of the core and the possibility of connection with the adjacent board. The appearance of the taped surface alone does not confirm the suitability of the damaged section.
Polyurethane insulation requiring protection on site
Store swissporPIR Alu horizontally, on level and hard supports, with a gap from the ground. Provide protection against precipitation, sunlight and UV radiation. The method of support should preserve the geometry of the boards until installation.
Plan the covering of the swissporPIR Alu packs and the route for moving large elements. Transport packaging does not replace permanent roofing over an exposed construction site. Protection against water, sun and impacts must also cover the time between storage and the installation position.
Inspection after rainfall and before covering
Before installing swissporPIR Alu, check that the cut-to-size joints are dry, free from damage and clean. The roof instructions require damp insulation to be replaced. Carry out the check before covering the boards with the next layer.
After rainfall, assess the exposed swissporPIR Alu and secure the open edge of the works. Damp insulation must not be enclosed in the roof instead of being replaced as required. Remove dust from the edges, and begin the next stage only after the prepared surface has been accepted and the compatibility of the contacting materials has been checked.
Safe storage location for the batch
The storage location for swissporPIR Alu pallets on the roof must be assessed with regard to the load-bearing capacity of the structure and protection against wind. A light individual board does not mean that any number of pallets may stand at one point.
The unloading plan for swissporPIR Alu should indicate the approved storage zones, the access routes for the crews and protection against wind. A single lightweight board does not confirm that the location can bear the load of many pallets. The organisation of the delivery must also protect the layers already laid against pressure and damage.
Insulation with polyurethane: deliveries in appropriate stages
Link deliveries of swissporPIR Alu to the daily progress and the possibility of closing a roof section. Excess material on an exposed site increases the extent of covering and moving. The schedule should therefore take into account the actual capacity to store the reserve.
Divide swissporPIR Alu into batches corresponding to the order of removal and to the inspections before covering. Too large a reserve makes protection difficult, but a shortage of a few boards can halt the closing of a section. A comparison of delivery offers should cover the same stages and work dates.
A case worth considering
Before incorporating swissporPIR Alu into the assembly, the condition of the surfaces in contact with the next layer must be checked. Dirt or moisture can prevent the joint from being made correctly. The preparation conditions follow from the board’s instructions and the system used. It is worth specifying an inspection point before covering. Materials that are consistent in the documentation must also be prepared to work together on site.