PIR insulation
SOPREMA EFYOS BLUE A in the flat roof layer build-up
At a glance
In the planned roof, BLUE A is to be placed between the vapour control layer and the waterproofing. The way each of these layers is connected at the parapet must be specified. The aluminium surface of the board does not automatically seal the joints of the entire build-up. The choice of covering should therefore take into account both the properties of the board and the details of its surroundings. The cross-section under consideration covers the thermal insulation of the flat roof beneath the waterproofing. The EFYOS BLUE A task must be described together with the layers adjoining its surface. The basis for agreement is the parapet cross-section with the levels of all layers. Before selecting materials, the height of the parapet above the final covering surface must be established so that the sequence of layers has a real reference.

Function of the board in the cross-section
A correct build-up should allow room for the thermal insulation layer and preserve the correct termination of the waterproofing. The functions of the remaining layers must be defined separately.
The correct product and the scope of its data
In the cross-section of a flat roof, EFYOS BLUE A provides thermal insulation beneath the waterproofing. The finished board consists of a PIR core and aluminium facings 50 μm thick on both sides. Declared are λD 0.022 W/(m·K), RD 4.50 m²K/W for 100 mm and 5.45 m²K/W for 120 mm, as well as CS(10/Y)120 and reaction-to-fire class E. Do not attribute these properties solely to the core. Square-edged or milled edges require correct dimensioning: the external dimension is not always the coverage dimension.
Scope of the example comparison
With a parapet using EFYOS BLUE A, the thickness of the thermal insulation is linked to the position of the waterproofing termination. For example, 100 mm at a lambda of 0.022 gives d/λ of approximately 4.55 m²K/W; this is a calculated result, not the declared RD. For a lambda of 0.040 adopted for comparison, such a resistance would require approximately 181.8 mm. These figures explain the change in thickness without attributing the parameters to another product. The suitability of a substitute is also determined by the facings, the fixing, the square-edged or profiled joint, and the support and load-distributing layer.
A calculation involving EFYOS BLUE A describes the stated quantity, not automatically the class of the entire system. The key assumption is a lambda of 0.022 W/(m·K). The result must be compared with the limitation defined as the height limit for the detailing. With reference to this cross-section, the level of the covering must be compared with the detailing drawing. A parapet cross-section with the levels of all layers is helpful, from which the position of each layer follows. Only then can the waterproofing covering above the board be considered without implicitly transferring the principles from another combination of materials.
How to assess the proposed change
The variant based on the decision to increase the board thickness must be considered through the full section. In the second step, the following action must be considered: refining the connection at the roof perimeter. With EFYOS BLUE A, both proposals must maintain the requirements at the location described as the termination of the thermal insulation at the parapet. The option of allocating the entire available height to the insulation alone must be excluded, because such a simplification changes the basis of comparison. The final scope should be confirmed by the roof section designer. For the selected solution, a schedule of thicknesses, edges and coverage areas is required, consistent with the materials located directly below and above the insulation.
Surface and joint finish
The surface of EFYOS BLUE A is a blue aluminium facing. Its type must be taken into account when selecting the layer with which it will work. In the documentation, the square-edged or milled joint must also be identified depending on the variant, instead of replacing the actual geometry with a general symbol. Acceptance should be based on the record of thickness and edge variant from the label. For this reason, the waterproofing covering above the board should only be installed after the agreed inspection. In the drawing, it is worth highlighting the termination of the thermal insulation at the parapet, because that is where the course of the connection changes.
The sequence of works follows from the layer build-up
Before laying EFYOS BLUE A, support for the boards with a load-distributing layer must be ensured. The schedule should include inspection of the element described as the termination of the thermal insulation at the parapet. For acceptance, a parapet section with level markings for all layers must be prepared, indicating any execution-related changes. After this inspection, work can proceed to the scope that is the waterproofing covering above the board. The sequence should be coordinated by the roof section designer, especially when different layers are carried out by different crews. This makes it possible to separate the tasks of the polyurethane insulation from the work ensuring the other functions of the section.
Specification ready for pricing
An enquiry for EFYOS BLUE A should clearly indicate thermal insulation of a flat roof under waterproofing. The description must include a schedule of thicknesses, edges and coverage areas so that the supplier knows the adopted variant. A separate item may be the work required to accommodate the thermal layer and maintain the correct waterproofing termination. It is worth requesting a breakdown of changes caused by any replacement of the facing or geometry. Each such proposal should again take into account the height limit at the flashing. Once the solution is selected, the record of thickness and edge variant from the label must be retained as the basis for identifying the material on site. In such an order, polyurethane boards are part of a specific system, not a category of freely interchangeable sheets.