Preparing channel-section wall rails for cladding installation
A sandwich-panel façade requires supports arranged in line with the direction in which the cladding is laid. In many industrial halls this role is performed by cold-formed channels. Their open section makes certain connections and framing easier to execute. This does not mean, however, that any channel will suit every panel. Good preparation of the wall begins with a coordinated drawing of the purlins, panels, openings and fixing details. The primary task of a purlin is to transfer the cladding loads to the main structure. In a typical arrangement the horizontal member spans between columns. Wind load reaches it through the panels and fasteners. The weight of the wall also requires a defined path of transfer to the supports.









