Building basics2026-11-15T18:16:21+01:00

Choose a product group

Metal roofing

Sandwich panels

PIR insulation boards

XPS

Accessories

Fencing

Building basics

Sandwich-panel.pl explains the basics of choosing sandwich panels, PIR insulation boards and metal roofing. Learn how the core differs from the facings, what the thickness describes and how the sheet dimensions relate to the effective cover area. The guides are intended for people planning a garage, industrial building, workshop or farm building. They explain which details to collect before ordering, how to identify accessories and what to inspect when the goods arrive. Use the articles to compare materials and prepare the questions that need to be resolved for your project.

What does an eaves drip flashing do, and where should it discharge?

The eaves flashing strip captures water flowing down the roof slope and directs it into the gutter, while also protecting the vulnerable roof edge. At handover, check not only its length and colour but above all whether its cross-section matches the covering, drainage and underlay. The shape of the folds, continuity of fall and correct connections along the entire eaves length are crucial. The under-gutter strip serves a different purpose, so the names are often confused. What matters is adaptation to the specific roof system, not a universal template.

What are the benefits and design requirements of a flat roof?

A flat roof does not mean abandoning falls; it requires a considered layer build-up and drainage. Readers should check whether the roof's function — such as technical equipment, photovoltaics or planting — was defined at design stage, because each changes the loads. It is also worth verifying that water can drain even if the primary outlet is blocked, and that service access reaches key details. Durability depends on the structure, waterproofing and regular inspections, not on the absence of slopes alone.

Will felt under steel sheet solve the dripping problem in an uninsulated building?

Felt under steel sheet can temporarily retain condensate and reduce dripping. However, it does not remove moisture from the building. To work, it must dry out afterwards. It makes most sense as part of a well-considered solution for an uninsulated building. If the roof leaks or the interior is constantly very humid, the fleece alone will not remove the cause. Moist air in contact with a sufficiently cool surface can release some of its vapour as water. A steel roof responds quickly to ambient conditions. In an uninsulated building, its underside is often a place where condensation forms. Drops can also form when it is not raining outside.

Roofing a pig house: assessing the suitability of corrugated fibre cement sheets

When choosing roofing for a piggery, more matters than price and colour. The roof is exposed to moisture, temperature changes and the environment associated with livestock farming. Corrugated fibre cement sheets should be checked as part of the whole system. Asbestos-free fibre cement can be a good solution if it suits the conditions of the building and its installations. An enquiry about the roof should state that it concerns a piggery. The seller and designer need information on ventilation, heating and the method of washing. It is not enough to write that the building is agricultural. This name covers both a well-ventilated shelter and a room with significantly higher humidity. It is worth indicating straight away whether the covering will be exposed from the interior.

Metal picket fencing for a new home: decisions to make before ordering

The fence for a new home is often built towards the end of construction. At that point it is easy to treat the pickets as the last purchase on a long list. Yet their height, spacing and colour depend on decisions made much earlier. Metal fence pickets work well as infill for bays, gates and pedestrian gates. They allow the plot boundary to be organised without the need to regularly paint bare wood. To make use of these advantages, the choice of product must be combined with a plan for the whole surroundings of the house. Measuring from today's ground can be misleading. Layers of driveway, edging and fill under the lawn may still be added at the building. Pickets made of sheet steel ordered before these works can end up too close to the ground once they are completed. Conversely, omitting a future lowering of the terrain will leave excessive clearance. The reference point should be common to the fence, the entrance and the driveway.

What must a PIR wall calculation include to be useful for the project?

A good calculator result starts with a good description of the building. The same wall can perform differently in a dry study and in a room where laundry is dried. A PIR calculation should therefore answer two questions: how much heat will pass through the wall, and whether, after changing the layers, moisture will be able to dry out safely. The designer needs the planned temperature, the heating method and information about vapour sources. A home office used for eight hours is a different situation from a guest room heated at weekends. It also matters whether the door to a cool corridor remains open and whether ventilation operates after the windows have been replaced.