Building basics2026-11-15T18:16:21+01:00

Choose a product group

Metal roofing

Sandwich panels

PIR insulation boards

XPS

Accessories

Fencing

Building basics

Sandwich-panel.pl explains the basics of choosing sandwich panels, PIR insulation boards and metal roofing. Learn how the core differs from the facings, what the thickness describes and how the sheet dimensions relate to the effective cover area. The guides are intended for people planning a garage, industrial building, workshop or farm building. They explain which details to collect before ordering, how to identify accessories and what to inspect when the goods arrive. Use the articles to compare materials and prepare the questions that need to be resolved for your project.

A modular steel building or a bespoke design – what determines the choice?

The company needs additional warehouse space, and there is a free rectangle on the plot. In such a situation, a modular hall seems the obvious choice. This changes when a long production line, a tall machine or a wide overhead crane has to go into the building. The choice should not be decided by the name of the system alone. First, the company's needs must be compared with the scope covered by a ready-made steel structure. Modular steel structures use repeatable components and a fixed geometry. The system may provide for several widths, a specified frame spacing and extension of the steel hall by further bays. As a result, part of the design and production work does not start from scratch. The supplier knows which components need to be prepared for a given variant.

Where is T7 sheet worth using? Cover widths and limitations of the lowest profiles

T7 is a good starting point for a conversation about lightweight cladding. The shallow profiling gives a calm surface, but it does not provide unlimited load-bearing capacity. This profile should be considered a specific façade product, with its own cover width and support requirements. Before buying, it is worth establishing whether it is to clad a wall, a gate, or a small structure. In a low trapezoidal profile, much of the sheet looks almost flat. The narrow profiles create delicate lines. This pattern may suit cladding for containers, a garden utility area, or a small façade. The name T7 refers to a family of profiles of low height, not to the material thickness.

PIR on pitched roofs: the layers from vapour control to roof covering

A roof with above-rafter insulation must be considered from the interior all the way to the covering. PIR boards restrict the flow of heat, but the other layers protect the structure from water and transfer loads. A well-chosen assembly shows how these functions come together at the eaves, the window and the chimney. PIR boards laid above the rafters form a layer that also covers the wooden structural elements. This allows their contribution to the flow of heat through the roof to be reduced. The role of the sheathing depends on the chosen roof solution. It should not be assumed that every rigid PIR board automatically replaces a load-bearing substrate.

How to prepare for installing cut-to-length tile-effect roof sheets

The key decisions for installing cut-to-size metal roof tiles must be made before delivery, not once work has started on site. It is therefore worth establishing whether measurements of the actually completed structure match the design and whether individual roof slopes and the points where sheets will be divided are clearly marked. Also check the lap arrangement, the eaves detail and how the long sheets will be unloaded. The cutting plan should be agreed between supplier and contractor, which reduces the risk of mass trimming or an incorrect lap.

How does a roof without projecting eaves work?

A roof without an eaves overhang ends the slope close to the wall face, giving a compact form but requiring a precise solution for drainage, ventilation and the junction between roof insulation and wall. The key decision variable is the cross-section of the edge detail, not merely hiding the gutter behind the façade. It is worth checking whether water from the slope and from the underlay has a planned path, whether the hidden gutter is accessible for cleaning, and whether thermal and air insulation connect tightly to the wall. Not every eaves-free roof has a hidden gutter – a visible system can also be a solution.

IKO enertherm MG under the membrane: material compatibility and installation

The MG system's surface that bonds with the waterproofing is a coated glass fleece. It must not be replaced in the design with an aluminium laminate. The choice of membrane and fixing method must take the actual facing into account. The thermal parameter is the second condition to be checked for the chosen thickness. The section under consideration is a flat roof beneath a synthetic membrane. The IKO enertherm MG specification must be described together with the layers adjoining its surface. A key detail is the junction between the membrane and the fleece-faced board surface. The basis for coordination is a roof section with a confirmed membrane fixing method. Before choosing materials, the insulation thickness and the condition of the substrate before the waterproofing is laid must be established, so that the layer sequence refers to actual conditions.