Recticel Eurothane Silver in a conventional warm roof: choosing the complete build-up

In a classic roof, the thermal insulation lies beneath the layer that protects against water. Eurothane Silver is intended for suitably selected roof systems. The specific method of fixing and the compatibility of the covering must be specified, rather than assuming that every combination is universal. Recticel Eurothane Silver is a PIR board with a multi-layer gas-tight foil on both sides and a printed grid. The current data sheet designates it for flat roofs in a classic assembly. When selecting PIR boards for an assembly, draw the classic flat roof for which mechanical fixing, bonding or ballast is being considered, in its actual cross-section. Eurothane Silver must be assigned to a specific mechanically fixed, bonded or ballasted assembly, because the other layers must match the same solution.

2026-11-16T01:35:44+01:00

Fibre cement roofing for cattle housing: moisture, ventilation and durability

In a cattle shed, the roof works above a space where moisture is constantly generated. Fibre cement sheets can be a good covering for such a building, but their advantages only become apparent in a correct arrangement. Asbestos-free fibre cement must be considered together with ventilation, structure and the way the cattle shed is used day to day. Conditions in a cattle shed depend on the number of animals, bedding, washing and air exchange. A building with large openings in the walls has different needs from a tightly closed room. An assessment of a new roof should begin by checking where moist air currently leaves the interior. It is not worth treating marks on the old covering as proof that every leak comes from loose sheets.

2026-11-15T18:28:33+01:00

What is bitumen-faced EPS, and when can it help with roof refurbishment?

A styropapa is an EPS board bonded to a layer of base roofing felt. It combines the function of thermal insulation with a prepared substrate for the subsequent covering layers. It can make work on the roof easier, but it does not replace an assessment of the old roof surface. Its use requires checking the substrate, moisture, fixing and the technology used to install the covering. The core is suitably selected polystyrene, and roofing felt is located on its surface. Lamination may be single-sided or double-sided, depending on the product. The boards come in specific formats and thicknesses. Some solutions have projecting felt overlaps that are used to make joints according to the manufacturer's instructions. In the documentation, for example, a format of 1000 × 1500 mm and a felt overlap 50 mm wide on two adjacent sides are found.

2026-11-16T06:07:55+01:00

XPS at an industrial building plinth: protecting insulation near ground level

The lower band of the hall wall works under difficult conditions. Water splashed from the yard, snow and mud reach it. Vehicles move nearby, and the external substrate may be at a different temperature from the interior. XPS helps to limit the flow of heat through this zone. Extruded polystyrene, however, requires protection and a correct connection with the rest of the building envelope. A band of boards glued to the wall alone does not yet form a complete plinth. The plinth height must be considered relative to the final ground level. At the construction stage it is often considerably lower than the finished yard or pavement. If the designer and the contractor use different levels, part of the finish may later end up in the ground.

2026-11-16T06:07:16+01:00

Refurbishing an industrial roof with XPS: check the loads first

XPS is lightweight, but a roof incorporating it can be considerably heavier than the existing covering. In an inverted system, protective and ballast layers are added, and sometimes a usable surface. Extruded polystyrene therefore gives no grounds for omitting an assessment of load-bearing capacity. When renovating a hall, the structure and the condition of the existing roof are checked first. Only then can it be considered whether XPS and the inverted layer sequence suit the given building. The type of structure, the spacing of supports and the composition of the existing layers must be established. Archived documentation helps, but does not always correspond to later alterations. Equipment, additional coatings or local repairs may have appeared on the roof.

2026-11-16T06:07:40+01:00