IKO enertherm ALU TAP with outlets and roof covering

For ALU TAP, the drainage plan should be consistent with the layout of the outlets and the covering details. Changing the position of a drain may require changing the order of the tapered boards. The membrane alone will not restore the intended direction of water flow on a poorly shaped field. The inspection should cover both the geometry and the subsequent sealing. The cross-section under consideration covers a roof with aluminium tapered boards at different pitches. The IKO enertherm ALU TAP task must be described together with the layers adjoining its surface. An important junction point is the joint between fields with a different drainage direction. The basis for agreement is the drainage field plan with marked pitches and heights. Before selecting materials, the height difference between the ends of the tapered board and the length in the direction of fall must be established so that the order of layers has a real reference.

2026-11-16T01:36:47+01:00

Kingspan PIR in roof systems: Therma TR26, TR27 and suitable facings

Kingspan boards are selected by family and application, not by brand alone. Therma TR26 and TR27 have a PIR core, whereas Kooltherm is phenolic foam insulation. The facings also differ: TR26 has an aluminium-containing facing, while TR27 has a glass fibre facing. A substitution requires checking the connection to the covering, the fixing, and the thickness needed to achieve the thermal resistance. In this guide, we separate these criteria from the assessment of load-bearing capacity and fire requirements. We also show why the full product name and documentation of the actual cross-section are needed to compare offers and approve a substitute material.

2026-11-16T06:06:44+01:00

XPS and fire safety in industrial buildings: key distinctions

XPS is a plastic thermal insulation. It should not be presented as a non-combustible material, even when it remains covered by concrete in the finished floor. Extruded polystyrene has a specific reaction to fire, and the building element has its own requirements. These are two different levels of assessment. In an industrial hall, the sequence of works, storage and later changes to installations also matter. Correct selection requires more than checking a single letter on the label. The reaction-to-fire class indicates how the material behaves under specific test conditions. It must be read from the documentation for the specific XPS. There is no basis for attributing an identical class to all boards. Products with different declarations are available on the market, including among materials of a similar colour.

2026-11-16T06:07:35+01:00

Flat roof with PIR boards: matching the facing, falls and fixing

Choosing PIR boards for a flat roof starts with the roof build-up as a whole. The type of facing affects bonding, and the fixing method must transfer loads to the substrate. Falls and drainage should be planned at the same time, because they affect the thickness and the detailing of the layer edges. Aluminium laminate, glass fleece and bituminous facing are not interchangeable surfaces. A glass-fleece surface and an aluminium laminate may require different contact layers. Compatibility must be confirmed for the specific type of membrane or roofing felt. The facing is the surface in contact with the next layer, so its type matters in practice.

2026-11-16T01:34:44+01:00

Roofing over animal feed: keeping out rain, maintaining hygiene and ventilation

A feed shelter should limit water ingress and make it easier to keep things tidy. Corrugated fibre cement sheets can be used for this purpose if they suit the structure and the storage conditions. Asbestos-free fibre cement is worth choosing together with a solution for the eaves, ventilation and service penetrations. The sheet alone does not ensure storage quality. Bagged feed, loose material and stock stored in separate bays do not require an identical layout. The storage recommendations for the specific product also matter. The roof should make it possible to meet them, but it does not replace checking the condition of the material received. On the plan, it is worth marking the unloading points and the places where feed is taken daily. These are where rain is most easily blown in through open gates.

2026-11-15T18:28:59+01:00

PIR boards in a roof assembly: identifying the right type

PIR boards can perform an important thermal function in a roof, but they do not form it on their own. The choice of variant must be linked to the substrate, the waterproofing and the method of fixing. A cross-section through the entire assembly explains the most. It shows what task each layer has. Polyurethane foam can also mean a spray-applied material or an gap-filling foam. Spray application requires identifying the cell structure and the execution conditions. Foam for filling gaps performs a different function from a board. None of these materials should be regarded as a substitute solely on the basis of the word polyurethane. The rigid core is only one of the elements in assessing a roof board. Polyurethane foam restricts the flow of heat, but it does not automatically take over the function of the sheathing and the covering.

2026-11-16T01:34:22+01:00

Checking a PIR quotation against the complete insulation system

Buying insulation can easily be reduced to the thickness and price of the board. In practice, however, correct performance is also determined by the materials at the interfaces between layers. A comparison with the complete assembly makes it possible to check whether the offer includes fixing, airtightness and the correct terminations. PIR boards may look similar yet have different facings, strength and intended use. Before purchase, a current technical data sheet, a declaration of performance and installation instructions are needed. A variant with a different facing may require a different adhesive. A substitute should be assessed together with the joint that will be made on its surface. The bill of materials should indicate the place of each variant in the assembly.

2026-11-16T01:34:49+01:00

Is standard EPS suitable for an inverted roof?

An ordinary EPS board described as suitable for roof and floor is not automatically suitable for an inverted roof. In such an arrangement the insulation lies above the waterproofing and may come into contact with water. A specific product intended for these conditions is required. However, this does not mean that every type of EPS is ruled out from the outset. In an inverted roof the waterproofing lies below the thermal insulation layer. The insulation and the subsequent layers protect it from some external influences. At the same time, the thermal insulation material is closer to rainwater. Rain can reach the spaces between the boards and the surface of the water-protection layer, depending on the system solution. These are different conditions from those beneath a sealed covering in a traditional roof.

2026-11-16T06:07:53+01:00

Combining PIR with cellulose or wood fibre: assessing the complete roof

More than one type of insulation can be used in a roof. PIR boards form a rigid layer, while cellulose or wood fibre can fill the designed spaces. Such a combination requires a deliberate choice of thermal layers, airtightness and the ability of the structure to dry out. Cellulose can be blown into prepared spaces. The layer above the structure and the infill between the rafters perform their task in different places. Their comparison should take into account the entire cross-section and the method of support. It is worth first identifying the layer that is to reduce the influence of the structural elements. Continuous PIR above the frame can perform a different task from a fibrous infill of the bays.

2026-11-16T01:34:29+01:00

A fibre cement roof over a grain store: its role in storage quality

The grain store covering should limit water ingress and allow the condition of the building to be monitored. Fibre cement sheets can be used in such a facility, but they do not replace the principles of grain storage. Asbestos-free fibre cement must be assessed together with ventilation, insulation and the organisation of loading and store operations. A dry roof surface is important, but it does not determine the conditions of the entire store. Moisture can come from the substrate, the walls and the grain itself when it is received. Temperature differences also matter. Therefore, when storage problems occur, it is not worth automatically blaming the covering alone. Before renovation, it is necessary to establish where and when dampness appears. Observations during rainfall and after cool nights help.

2026-11-15T18:28:57+01:00