BauderPIR FA-TE in a terrace: sequence and tasks of the layers

A terrace with FA-TE comprises insulation, waterproofing and the use layers. The support for the surface can transfer force to a much smaller area than the surface of the entire board. Such an arrangement requires a separate assessment of the pressure and protection of the covering. The PIR compression parameter does not replace the design of the solution above the insulation. The cross-section under consideration comprises the thermal insulation of the terrace above a room. The task of BauderPIR FA-TE must be described together with the layers adjoining its surface. An important junction is the threshold of the terrace door and the nearby drain. The basis for agreement is the terrace cross-section at the door with the marked levels. Before selecting materials, the distance between the substrate and the permissible level of the surface must be determined so that the sequence of layers has a real reference.

By |2026-11-16T01:36:24+01:002022-06-19|Construction basics|Comments Off on BauderPIR FA-TE in a terrace: sequence and tasks of the layers

Which PIR board under render should you choose for an aerated concrete wall?

Aerated concrete can form a warm wall, but its properties depend on the grade and thickness. When planning a PIR façade under render, you need to check both the thermal result and the compatibility of the whole system. Moisture in new masonry, substrate adhesion and fixings suited to the lightweight wall material are separately important. A general phrase 'aerated concrete' is not entered into the calculations. You need the correct thermal conductivity value for the grade used and the design conditions. Masonry of the same thickness can have different insulation performance. Joints and local reinforced concrete elements also matter.

By |2026-11-14T10:16:58+01:002022-06-08|Construction basics|Comments Off on Which PIR board under render should you choose for an aerated concrete wall?

How to choose trapezoidal steel sheet for a workshop roof? Profile, thickness, fleece and full cost

The roof over a workshop is there to protect equipment and allow comfortable use of the interior. Cheap sheet metal alone does not solve the issues of moisture, heating or noise. It is therefore worth starting the choice of trapezoidal steel sheet with what will happen beneath it. Only then are the profile, steel, coating and accessories selected. A tool store opened once a week has different needs from a workshop used daily. Temperature, humidity and the presence of people matter. If wet items are dried inside, provision must be made for removing moisture. Sealing all openings tightly is not a way to make it disappear.

By |2026-11-14T12:35:33+01:002022-06-07|Construction basics|Comments Off on How to choose trapezoidal steel sheet for a workshop roof? Profile, thickness, fleece and full cost

Z-purlins on a steel building – checks before the roof panels go on

On a finished hall, the purlins are barely visible. During installation, however, much of the subsequent work depends on how they are set. Z-purlins support the roof panels and transfer loads to the main structural elements. Their layout must match the design, not merely look level from the yard. It is worth inspecting the cold-formed profiles before roofing begins. Later, access to the connections and correction of errors will be considerably more difficult. Two Z-purlins of the same height may differ in thickness, flanges or hole pattern. The delivery should therefore not be sorted by appearance alone. The marking on an element should lead to a specific item in the schedule. This applies in particular to purlins intended for end and intermediate spans.

By |2026-11-15T03:33:26+01:002022-06-06|Construction basics|Comments Off on Z-purlins on a steel building – checks before the roof panels go on

How to install modular tile-effect metal roofing

The key to correct installation of modular metal roof tiles is confirming that the roof pitch and layers meet the requirements of the chosen profile, and that the batten grid is level and follows the instructions. Check the eaves line, diagonals and support plane, as well as the completeness of material, flashings and accessories. Batten spacing follows from the profile module, and the first row sets the run of the entire covering. The order of laying depends on the edge shape and water drainage. Before final fixing, assess the fit of components and the row line.

By |2026-11-14T19:47:48+01:002022-06-03|Construction basics|Comments Off on How to install modular tile-effect metal roofing

What needs to be checked to assess a PIR roof for fire performance?

The question of whether a PIR roof panel is fire-resistant requires clarification. A different test describes the product's contribution to fire development, another the fire resistance of the roof, and yet another the effect of fire from outside. A specific system may have particular classifications. However, these must be read for the intended thickness, support and method of construction of the entire roof. The PIR core is a foam, and the complete panel also contains steel, coatings and joint elements. The behaviour of the product is determined by the whole assembly. Not every PIR panel should be called non-combustible. Nor should the documented properties of a specific system be overlooked simply because of the name of the core.

By |2026-11-14T12:37:56+01:002022-06-01|Construction basics|Comments Off on What needs to be checked to assess a PIR roof for fire performance?

Eurofloor in a floor build-up. Layers, services and support

In a floor, every element needs space and proper support. Eurofloor forms the thermal insulation layer, while the distribution of loads depends on the entire build-up. It is worth drawing the details around pipes and at walls before ordering the boards. Recticel Eurofloor has a rigid PIR foam core and a multi-layer gas-tight foil with a printed grid on both sides. The manufacturer intends it for thermal insulation of floors, including those with underfloor heating. When selecting PIR boards for the build-up, draw the floor with the heating installation located in the layers above the thermal insulation in a true cross-section. Eurofloor must be placed in the correct floor cross-section together with the planned heating installation, because the remaining layers must fit the same solution.

By |2026-11-16T01:35:42+01:002022-05-25|Construction basics|Comments Off on Eurofloor in a floor build-up. Layers, services and support

How can you reduce the cost of sandwich panels without making accidental design changes?

Savings on panel purchase often start with the building drawing, before the first quote appears. Repetitive dimensions and the right selection for the rooms can reduce waste and the scope of work. Below are seven areas worth checking. Every technical change must be assessed together with the envelope design. Not all parts of the building need to have the same internal conditions. In a heated workshop, the heat loss balance matters, while in a dry seasonal warehouse the priorities may be different.

By |2026-11-14T12:36:11+01:002022-05-25|Construction basics|Comments Off on How can you reduce the cost of sandwich panels without making accidental design changes?

Identifying damp insulation before roof refurbishment

Dampness beneath the roof covering cannot be reliably assessed by simply walking over the roof. A stain on the ceiling, a blister in the roofing felt and a camera image indicate places to check, but they do not always show the extent of the problem. Before renovation, an assessment of the layers and the source of the water is needed. Only then can you decide what to dry out, leave in place or replace. The most obvious cause is a leak through damaged covering. Water can get in at outlets, flashings, membrane joints and service penetrations. However, it does not have to flow vertically above the visible stain. It can migrate through the layers and only then find a path to the interior.

By |2026-11-16T06:08:12+01:002022-05-22|Construction basics|Comments Off on Identifying damp insulation before roof refurbishment

What should you look for in cut-to-length tile-effect roofing sheets?

The quality of a cut-to-size metal roof tile is determined by how well its declared parameters match the documentation, not by appearance alone. Before buying, check whether the specification states the nominal core thickness, the type of metallic substrate and coating, and the full profile data. Pay attention to the coverage width and the module drawing, as these show the actual roof coverage. Also compare the cutting plan with the roof geometry — even the right material can be badly fitted. Choose an offer that clearly separates this information rather than relying on generic terms.

By |2026-11-14T16:29:40+01:002022-05-16|Construction basics|Comments Off on What should you look for in cut-to-length tile-effect roofing sheets?